Bathroom Tile Prep

Meanwhile the Tile/Stone guy is prepping the bathrooms for the tile. He is putting cement up which is what the tile will go on.


The tar paper on the bench in the master shower.


First goes the tar paper and then the mesh which will hold the first layer of cement.


The mesh is tight. This is better mesh than traditional chicken wire, which is still used. This is the master niche being cut out.


This is the first layer of cement in the master bath. It is given a rough surface so it can hold the second layer.


The wheelbarrow where they mix the cement.


This is a temporary support in the laundry rooom for the soap niche in the master shower.


Hall bath niche

Comments are closed.