Archive for September, 2006

Entry Floor 3

Thursday, September 28th, 2006

3313

3314

Entry Floor 2

Wednesday, September 27th, 2006

3305

3306

3307

3308

3309

3310

3311

3312

Entry Floor

Tuesday, September 26th, 2006

3302

3303

Wood Cutting for Hardware Installation 3

Monday, September 25th, 2006

3299

3300

3301

Wood Cutting for Hardware Installation 2

Sunday, September 24th, 2006

3290

3291

3292

3293

3294

3295

3296

3298

Wood Cutting for Hardware Installation

Saturday, September 23rd, 2006

3266

3268

3269

3270

3271

3272

3273

3274

3275

3278

3279

3285

3286

3289

3267

3276

3277

Painting the Patio Roof Finished!

Friday, September 22nd, 2006

3254

3255

3256

3257

3258

Hearth Goes In

Monday, September 18th, 2006

3237

3238

3239

3240

3241

3242

Staining Still

Saturday, September 16th, 2006

3231

3232

3233

3235

Michelangelo Still At It

Saturday, September 16th, 2006

3228

3236

Slab Mistake

Saturday, September 16th, 2006

One thing they did incorrectly was the side slabs of the shower opening. THey were not supposed to get narrower when they met the wainscot. They were supposed to stick out about 3/4 inch, but now they are even and the edge of the slab looks funny meeting the drywall. It’s not as clean looking as it could be.

3234

Thresholds

Friday, September 15th, 2006

They brought the thresholds today too. Bathrooom carrera thresholds and the limestone for the two entry thresholds.

3205

Master Counter Slab Installation

Friday, September 15th, 2006

They couldnt do this before because we were missing a cap for the center leg of the leg system. So that took only 5 days to get on site, but then the slab guys couldn’t get to the house until today, 6 weeks later.
By this time, I was just daily to the contractor “Where the @#%#%^ are they?!”
Watching them put this together was very interesting.

3187

3188

3189

3190

3191

3192

3193

3194

3195

3196

3197

3198

3199

3200

3201

3202

3203

3204

3205

3207

3208

3209

3210

3211

3212

3214

3216

3217

3218

3219

3220

3221

3222

3223

3224

3225

3226

3227

Front Door Arrives

Friday, September 15th, 2006

3185

Lightboxes

Friday, September 15th, 2006

These are the lightboxes painted white. Now all we need is the glass and the chrome and the electrical fixtures.

3183

3184

Painting Continues

Thursday, September 14th, 2006

I’ve dubbed the painter Michelangelo. Because he is taking meticulous care and taking forever!

3170

3181

Master Bath Leg System

Thursday, September 14th, 2006

3177

3178

Selective Mitering

Thursday, September 14th, 2006

3179

3180

More Shots of Stain

Thursday, September 14th, 2006

3171

3174

3175

3176

The Stainers Have Taken Over

Wednesday, September 13th, 2006

3167

3168

3169