Michelangelo Still At It

September 16th, 2006

3228

3236

Slab Mistake

September 16th, 2006

One thing they did incorrectly was the side slabs of the shower opening. THey were not supposed to get narrower when they met the wainscot. They were supposed to stick out about 3/4 inch, but now they are even and the edge of the slab looks funny meeting the drywall. It’s not as clean looking as it could be.

3234

Thresholds

September 15th, 2006

They brought the thresholds today too. Bathrooom carrera thresholds and the limestone for the two entry thresholds.

3205

Master Counter Slab Installation

September 15th, 2006

They couldnt do this before because we were missing a cap for the center leg of the leg system. So that took only 5 days to get on site, but then the slab guys couldn’t get to the house until today, 6 weeks later.
By this time, I was just daily to the contractor “Where the @#%#%^ are they?!”
Watching them put this together was very interesting.

3187

3188

3189

3190

3191

3192

3193

3194

3195

3196

3197

3198

3199

3200

3201

3202

3203

3204

3205

3207

3208

3209

3210

3211

3212

3214

3216

3217

3218

3219

3220

3221

3222

3223

3224

3225

3226

3227

Front Door Arrives

September 15th, 2006

3185

Lightboxes

September 15th, 2006

These are the lightboxes painted white. Now all we need is the glass and the chrome and the electrical fixtures.

3183

3184

Painting Continues

September 14th, 2006

I’ve dubbed the painter Michelangelo. Because he is taking meticulous care and taking forever!

3170

3181

Master Bath Leg System

September 14th, 2006

3177

3178

Selective Mitering

September 14th, 2006

3179

3180

More Shots of Stain

September 14th, 2006

3171

3174

3175

3176

The Stainers Have Taken Over

September 13th, 2006

3167

3168

3169

Needs a MiterMiter

September 12th, 2006

3165

3166

Staining

September 12th, 2006

3154

3155

3156

3157

3158

Patio Roof Painting

September 12th, 2006

3152

3153

3159

3160

3161

3162

3163

3164

Cutting the PortHole hole

September 11th, 2006

3140

3141

3142

3143

3147

3149

Staining Starts in Earnest

September 11th, 2006

3144

3145

3146

Patio Roof Complete!

September 9th, 2006

3127

3128

3129

3130

3131

Master Bath Toilet Holder and Wainscot

September 8th, 2006

3118

3120

3121

3123

3124

Fourth Layer of Patio Roof

September 8th, 2006

3107

3108

3109

3110

3111

3112

3113

3122

Stain Samples on Interior of Doors

September 8th, 2006

3114

3115

3116

3117

3125

3126