« August 2006 | Main | October 2006 »
September 28, 2006
Entry Floor 3
Posted by dana at 06:19 PM | Comments (0)
September 27, 2006
Entry Floor 2
Posted by dana at 07:18 PM | Comments (0)
September 26, 2006
Entry Floor
Posted by dana at 06:16 PM | Comments (0)
September 25, 2006
Wood Cutting for Hardware Installation 3
Posted by dana at 02:14 PM | Comments (0)
September 24, 2006
Wood Cutting for Hardware Installation 2
Posted by dana at 09:13 PM | Comments (0)
September 23, 2006
Wood Cutting for Hardware Installation
Posted by dana at 07:08 PM | Comments (0)
September 22, 2006
Painting the Patio Roof Finished!
Posted by dana at 03:04 PM | Comments (0)
September 18, 2006
Hearth Goes In
Posted by dana at 03:00 PM | Comments (0)
September 16, 2006
Staining Still
Posted by dana at 06:57 PM | Comments (0)
Michelangelo Still At It
Posted by dana at 06:54 PM | Comments (0)
Slab Mistake
One thing they did incorrectly was the side slabs of the shower opening. THey were not supposed to get narrower when they met the wainscot. They were supposed to stick out about 3/4 inch, but now they are even and the edge of the slab looks funny meeting the drywall. It's not as clean looking as it could be.
Posted by dana at 06:50 PM | Comments (0)
September 15, 2006
Thresholds
They brought the thresholds today too. Bathrooom carrera thresholds and the limestone for the two entry thresholds.
Posted by dana at 07:58 PM | Comments (0)
Master Counter Slab Installation
They couldnt do this before because we were missing a cap for the center leg of the leg system. So that took only 5 days to get on site, but then the slab guys couldn't get to the house until today, 6 weeks later.
By this time, I was just daily to the contractor "Where the @#%#%^ are they?!"
Watching them put this together was very interesting.
Posted by dana at 07:53 PM | Comments (0)
Front Door Arrives
Posted by dana at 07:51 PM | Comments (0)
Lightboxes
These are the lightboxes painted white. Now all we need is the glass and the chrome and the electrical fixtures.
Posted by dana at 07:47 PM | Comments (0)
September 14, 2006
Painting Continues
I've dubbed the painter Michelangelo. Because he is taking meticulous care and taking forever!
Posted by dana at 06:50 PM | Comments (0)
Master Bath Leg System
Posted by dana at 06:48 PM | Comments (0)
Selective Mitering
Posted by dana at 06:47 PM | Comments (0)
More Shots of Stain
Posted by dana at 05:46 PM | Comments (0)
September 13, 2006
The Stainers Have Taken Over
Posted by dana at 05:44 PM | Comments (0)
September 12, 2006
Needs a MiterMiter
Posted by dana at 06:43 PM | Comments (0)
Staining
Posted by dana at 06:28 PM | Comments (0)
Patio Roof Painting
Posted by dana at 06:26 PM | Comments (0)
September 11, 2006
Cutting the PortHole hole
Posted by dana at 08:23 PM | Comments (0)
Staining Starts in Earnest
Posted by dana at 08:20 PM | Comments (0)
September 09, 2006
Patio Roof Complete!
Posted by dana at 10:18 PM | Comments (0)
September 08, 2006
Master Bath Toilet Holder and Wainscot
Posted by dana at 06:15 PM | Comments (0)
Fourth Layer of Patio Roof
Posted by dana at 06:14 PM | Comments (0)
Stain Samples on Interior of Doors
Posted by dana at 06:12 PM | Comments (0)
September 07, 2006
First Three Layers Complete
Posted by dana at 08:11 PM | Comments (0)
September 06, 2006
Cutting Corbels and Raising Wood Up
Posted by dana at 07:07 PM | Comments (0)
September 05, 2006
Applying Stain Sample
Posted by dana at 06:02 PM | Comments (0)
September 01, 2006
Trust but Verify
Posted by dana at 06:59 PM | Comments (0)
