Slab Mistake

One thing they did incorrectly was the side slabs of the shower opening. THey were not supposed to get narrower when they met the wainscot. They were supposed to stick out about 3/4 inch, but now they are even and the edge of the slab looks funny meeting the drywall. It’s not as clean looking as it could be.

3234

Master Counter Slab Installation

They couldnt do this before because we were missing a cap for the center leg of the leg system. So that took only 5 days to get on site, but then the slab guys couldn’t get to the house until today, 6 weeks later.
By this time, I was just daily to the contractor “Where the @#%#%^ are they?!”
Watching them put this together was very interesting.

3187

3188

3189

3190

3191

3192

3193

3194

3195

3196

3197

3198

3199

3200

3201

3202

3203

3204

3205

3207

3208

3209

3210

3211

3212

3214

3216

3217

3218

3219

3220

3221

3222

3223

3224

3225

3226

3227

Tile Looks Odd

We told the tile guy to take tile from different boxes as he went along, he says he did and that the similar colors are because the quickset is drying at different rates under the tile. He says that over time, the tiles will even out.

2731

2732

2733